Dholera Group

Register of companies · Dholera SIR · REV 1 · 4 August 2026

201820232026

Cube Construction Engineering Limited

Cube Construction Engineering Limited is named in one of the three Dholera SIR public registers used here, the DICDL awarded works and service contracts, read on 4 August 2026. It is named on 1 works or service contract awarded by DICDL, worth 72.31 INR crore where it is the sole named awardee. Its earliest date in any of these registers is 2025-03-31, which is date of the source document, no award date is published.

  • RERA · no LAND · no WORKS
  • PRIVATE COMPANY
  • FIRST ON FILE 2025-03-31
  • DOCUMENT DATE
201820232026

Vintage rail 2018 to 2026 · square is the first public record · ticks are dated years

Name as printed, per source, for Cube Construction Engineering Limited. Each source's own spelling is preserved. As of 4 August 2026.
Name as printedRegisterSource
M/s. Cube Construction Engineering Limited (CCEL)WORKSdicdl_ar25.pdf p.100
CCELALIAS, PRINTED IN THE SOURCEdicdl_ar25.pdf
W

DICDL works and service contracts

Contracts naming Cube Construction Engineering Limited: 1. Values as printed, INR crore. A joint-venture award carries one value for the venture and is never divided. Source: DICDL annual reports. As of 4 August 2026.
WorkValueAward dateBasisJoint ventureTagSource
Design and Construction of Administration and Business Centre of Dholera (ABCD) Building, DSIR, Dholera.72,31,11,111/-not publishedEPCsole named awardeeOFFICIALdicdl_ar25.pdf

1 rows · 1 priced in this company's sole name, 0 held in joint venture, 0 with no value disclosed · source DICDL annual reports · as of 4 August 2026

Design and Construction of Administration and Business Centre of Dholera (ABCD): the source words and the status
B. The Company had awarded contract for Design and Construction of Administration and Business Centre of Dholera (ABCD) Building in DSIR, Dholera on EPC Basis to M/s. Cube Construction Engineering Limited (CCEL) with contract amount of 72,31,11,111/-. CCEL has raised following claims: Claim No. 01 :- Cost Incurred as Result to Build Up Area Being More Than Contract (Cost Amount: Rs. 20,16,11,451/-) Claim No. 02 :- Cos

Status. Contractor has raised five claims against DICDL (build-up area excess, steel difference/escalation, extra foundation cost, outstanding maintenance bills, bank guarantee extension charges); disclosed under contingent liabilities.

Exact contract amount printed in the notes to the financial statements as 72,31,11,111/-. Original figure retained in value_as_printed; the crore conversion is arithmetic only. Award date is NOT stated in the source - left null. Widely repeated web claims of a 2021 award date come from property-marketing sites and were not used.

P

Position on the ranked lists

Where Cube Construction Engineering Limited sits on each ranked list it qualifies for, 3 of the 7 company lists. Position is on one published column and nothing else, never a combined score. Source: the registers cited above. Last verified 4 August 2026.
RankRanked listPositionOn this figureRanked on
1Top Dholera construction companies1 of 972.31 INR crore in its sole namedisclosed award value in the company's sole name, INR crore
18Top Dholera real estate companies18 of 391 of 3 registers, 1 recordregisters naming the company, then records held
32Oldest Dholera companies on the public record32 of 39first on file 2025-03-31, document dateearliest date in any of the three registers

3 of 7 company lists · a list this company does not appear on measures a register it is not in · also grouped by legal form at Dholera companies by legal form · last verified 4 August 2026

N

What these sources do not state about this company

  • A tender identifier, on every contract in every source
  • An estimated contract value, so bid against estimate cannot be shown
  • A contract duration or scheduled completion date
  • A company identification number, a registered office and an incorporation date

Gaps in the public documents, not omissions here. Nothing has been estimated. Send a public document to corrections@dholera-group.com and the record is corrected and dated. Full limitations list.

Entry for Cube Construction Engineering Limited · register edition 4 August 2026 · back to the register · all twelve ranked lists

4 terms

The words on this page, in plain English

These are the terms the government documents use. Each one is expanded here because a register is unreadable if you do not already work in one, and you should not have to.

Dholera SIR
Dholera Special Investment Region. A specific area of land south west of Ahmedabad that the Gujarat government notified for industrial development, with a boundary drawn on a map. A plot is either inside that boundary or it is not, and everything on this site refers only to the inside.
DICDL
Dholera Industrial City Development Limited. The government-owned company that builds the roads, water and power inside Dholera SIR and allots land to other companies. Its annual reports are audited and published, which is where the land and contract figures on this site come from.
Crore
Ten million. One crore rupees is 10,000,000 rupees.
OFFICIAL, REPORTED and TARGET
The tag on a figure says how solid it is. OFFICIAL means it is printed in a government document. REPORTED means a named third party published it and the government has not. TARGET means it is a plan for the future, not an achieved number. Nothing is presented without one of these.