Dholera Group

Register of companies · Dholera SIR · REV 1 · 4 August 2026

201820232026

Build Well Engineers

Build Well Engineers is named in one of the three Dholera SIR public registers used here, the DICDL awarded works and service contracts, read on 4 August 2026. It is named on 1 works or service contract awarded by DICDL, worth 27.99 INR crore where it is the sole named awardee. Its earliest date in any of these registers is 2025-02-28, which is contract award.

  • RERA · no LAND · no WORKS
  • PRIVATE COMPANY
  • FIRST ON FILE 2025-02-28
  • EVENT DATE
201820232026

Vintage rail 2018 to 2026 · square is the first public record · ticks are dated years

Name as printed, per source, for Build Well Engineers. Each source's own spelling is preserved. As of 4 August 2026.
Name as printedRegisterSource
M/s Build Well EngineersWORKSdicdl_ar25.pdf p.24
W

DICDL works and service contracts

Contracts naming Build Well Engineers: 1. Values as printed, INR crore. A joint-venture award carries one value for the venture and is never divided. Source: DICDL annual reports. As of 4 August 2026.
WorkValueAward dateBasisJoint ventureTagSource
Integrated School, Dholera - construction work. CBSE/IB standards, Nursery to 12th Standard; plot area 34,529 sq m; built-up area 6,082.11 sq m.₹27.99 Crore2025-02-28EPCsole named awardeeOFFICIALdicdl_ar25.pdf

1 rows · 1 priced in this company's sole name, 0 held in joint venture, 0 with no value disclosed · source DICDL annual reports · as of 4 August 2026

Integrated School, Dholera - construction work. CBSE/IB standards, Nursery to 12: the source words and the status
The Integrated School project construction work was awarded to M/s Build Well Engineers on an EPC basis. The award date was February 28, 2025, with a project cost of ₹27.99 Crore. M/s TPF Engineering Pvt Ltd. serves as the Project Management Consultant (PMC). The school, adhering to CBSE/IB standards (Nursery to 12th Standard), covers a plot area of 34,529 square meters and a

Status. Under construction; construction started June 13, 2025

Value is stated as 'project cost'. PMC: M/s TPF Engineering Pvt Ltd.

A

Named in DICDL's annual report

How DICDL's own annual reports name this company, 1 mention. Source: DICDL annual reports FY2023-24 and FY2024-25. As of 4 August 2026.
Role in the reportPrinted asFinancial yearStated as atSource
contractor or allottee on Integrated SchoolM/s Build Well EngineersFY2024-25as at 2025-03-31dicdl_ar25.pdf p.24

1 rows · source DICDL annual reports · tag OFFICIAL · as of 4 August 2026

P

Position on the ranked lists

Where Build Well Engineers sits on each ranked list it qualifies for, 3 of six. Position is on one published column and nothing else. Source: the registers cited above. As of 4 August 2026.
Ranked listPositionOn this figure
Cross-register footprint16 of 391 register, 1 record
Works contracts won3 of 927.99 INR crore disclosed
First on file29 of 392025-02-28, event date

3 of six lists · a list this company does not appear on measures a register it is not in · as of 4 August 2026

N

What these sources do not state about this company

  • A tender identifier, on every contract in every source
  • An estimated contract value, so bid against estimate cannot be shown
  • A contract duration or scheduled completion date
  • A company identification number, a registered office and an incorporation date

Gaps in the public documents, not omissions here. Nothing has been estimated. Send a public document to corrections@dholera-group.com and the record is corrected and dated. Full limitations list.

Entry for Build Well Engineers · register edition 4 August 2026 · back to the register · ranked lists